Sun Valley Park

To address the issues of limited recreational use and drainage problems at Sun Valley Park, Partridge was commissioned to undertake the stormwater management and civil design for the upgraded car park and public walkways. The existing park infrastructure, including two basketball courts and public amenities, had reached the end of its life. The flood-prone southern […]

Tom Wills Oval – Amenities Block

This new amenities block doubles as a storage facility at an Australian Rules football pitch at Sydney Olympic Park. We provided design, engineering drawings and site supervision. The project involved erosion and sediment control, certification of infiltration system, effluent pipe and fittings, buried flexible pipelines, plumbing and drainage.

Yarra Oval

This project for the Randwick City Council required design of roof drainage and stormwater disposal for the Yarra Oval storage building. Our role was to design a system that ensured water runoff from the roof is properly collected, transported, and disposed of in a safe and efficient manner.

Mosman House V

Partridge provided the roof and stormwater design to the multi-level residential development in Mosman. The project involved working closely with the architect in order to document suitable drainage provisions to the intricate roof design. The stormwater system was conceptually documented and approved for the development application and then a detailed design approach was taken for […]