Partridge ensured the structural integrity of this giant inflatable baseball which floated down the Panama Canal, celebrating the release of Sech Music’s new album. Transporting the 10-metre- round baseball required a platform that used four tonnes of concrete, and a four-by-five-metre high truss structure, secured with straps, cables, and much engineering ingenuity by the Partridge team.